CUTTING-EDGE INFRASTRUCTURE
Quality infrastructure is a prerequisite for a business environment and the quality of life to flourish. Cutting-edge technology combined with global practices in infrastructure service delivery makes GIFT City a smart city with international standards. Here you will witness various infrastructure masterpieces implemented for the first time in the country.
INDIA’S FIRST DISTRICT COOLING SYSTEM
Read more..
CITY COMMAND & CONTROL CENTER (C4)
Read more..
SMART WATER INFRASTRUCTURE
Read more..
POWER INFRASTRUCTURE
Read more..
INDIA’S FIRST AUTOMATED WASTE MANAGEMENT
Read more..
UTILITY TUNNEL
Read more..
INDIA’S FIRST DISTRICT COOLING SYSTEM
Read more..
Gift City Utilities
Sustainable City
Water Solutions
Versatile Power
Solution Hub
Information
Communication
Technology
C-4 (City Command & Control Centre)
Automated Waste
Collection System
TIER IV Data
Centre
Strong Talent
Sprite
Ease of
Connectivity
Social Infrastructure
Water :
- Potable water from any Tap throughout city.
- Zero discharge city with waste water recycled & used for landscape irrigation.
Water Supply & Sewerage System
- Water Sources:
- Narmada Main canal
- Recycling and Reuse of Wastewater
- Rainwater Harvesting
- 24 x 7 Water Supply
- Concept of Zero Discharge City
- Perennial Water Front ensured through construction of three barrages on river Sabarmati
- Proposed landscaped promenade at the river bank along GIFT City
Samrudhi Sarovar & Waterfront Development
-
1 km length & 7 m depth
-
Width varying from 82 m to 160 m
-
Designed for 15 days drinking water storage
-
Water Body of 0.75 Mm3 capacity to enhance aesthetics and for water sports activity
Power :
Dual power supply at Power Station with building level Back-up power facility.
Power Infra Highlights
-
GIFT Power Company Ltd., 100% subsidiaries of GIFTCL is Power distribution licensee for GIFT
-
Projected Power demand of GIFT is 610 MVA.
-
220/33KV Receiving Stations with Dual source of Power.
-
Initially 66/33KV receiving station with Dual source of Power.
-
33 kV dual feed cable distribution in Utility Tunnel to all the packages.
-
Centralised Backup power feed through same network.
-
State-of-the-art automation setup for Substation, Distribution, Lighting and distribution network with real time monitoring and control.
-
Power Distribution strategy
-
Gas Insulated Switchgears (GIS) substation for Sub-transmission and Distribution within GIFT city
-
Building level Switching panel room with GIS switchgear inside utility tunnel connecting each package
-
Dual 33KV feed to every building from Switching panel room
-
Complete Electrical infrastructure of building shall be developed and maintained by developer
-
- Water Sources:
- Narmada Main canal
- Recycling and Reuse of Wastewater
- Rainwater Harvesting
- 24 x 7 Water Supply
- Concept of Zero Discharge City
- Perennial Water Front ensured through construction of three barrages on river Sabarmati
- Proposed landscaped promenade at the river bank along GIFT City
Samrudhi Sarovar & Waterfront Development
-
1 km length & 7 m depth
-
Width varying from 82 m to 160 m
-
Designed for 15 days drinking water storage
-
Water Body of 0.75 Mm3 capacity to enhance aesthetics and for water sports activity
GIFT Power Company Limited 66/33kV substation (60MVA Capacity)
GIFTCL’s Power Distribution Philosophy
GIFTCL’s Power Distribution Philosophy
Information-Communication-Technology :
GIFT City is connected with a fault tolerant optical fiber ring Infrastructure.
Automated Waste Collection System (AWCS) :
Fully integrated & automatic waste collection, segregation & disposal system at City Level.
-
Automated Waste Collection System (AWS) through chute system
-
Minimum Human Intervention
-
Minimize space requirement
-
Minimize impact on health
-
Waste sucked through pipes at a speed of 90 km/hr
-
Waste Treatment through Plasma Technology
Fully Automatic District Cooling System (DCS) at city level :
System Highlights:
-
Total cooling load capacity – 1,80,000 TR
-
State-of-the-art technology with series counter flow chillers and Thermal storage tank
-
Chilled water distribution through underground utility tunnel
-
Effective metering and control through SCADA
Salient Advantages:
-
Reduced Energy Cost through diversity
-
Reduce global warming potential (GWP) due to use of green refrigerant
-
Reduce operation & maintenance
-
Economical for end-user
Underground Utility Tunnels
GIFT City is being developed as a state-of-the-art financial hub which shall require huge infrastructure with excellent planning, designing and engineering with latest technologies. In respect to vast infrastructure systems, GIFT developed the vision of “DIGGING FREE CITY” by placing all the utilities in a TUNNEL across the city so that there is no need to excavate the roads in future for repair/maintenance /renovation/up gradation of any utility. The provisions are made in the tunnel for smooth access, separation of utilities, proper drainage, lighting, and other long-term concerns, such as maintenance and security.
The Utility Tunnel will accommodate all the utilities including Power Cables, Raw Water supply pipe line to Water Treatment Plant (WTP) as well as treated water supply pipe line from WTP to various developments, chilled water supply from District Cooling Pipe (DCP) to various developments and return pipe line to DCP, ICT cables, Automated Waste Collection pipe line, Fire hydrant water pipe line, etc. From safety point of view the tunnel is divided into WET and DRY sections which are physically separated with each other. Wet section is carrying utilities related to water, ICT and others while dry section carries power cables and have access from top. The wet section has been designed in such a manner that material handling or maintenance vehicles can enter into.
Total length of the Tunnel within GIFT City shall be approx. 16 Km and shall be provided with Ventilation system, Rodent Repellent System and Fire & Smoke Detection System for the purpose of safety. The size of the Tunnel shall vary depending on the no and size of the Utilities and may go up to as large as 8 M wide X 11M deep.
C-4(City Command & Control Centre)
GIFT uses advance of technology in form of unique IoT (Internet of Things) based to monitor and manage city Infrastructure.
TIER IV Data Centre
A state of the art certified TIER IV Green Data Centre by Tata Communications with a capacity of 900 Racks is up and running.
Masterplan
Boundaryless built space
Urban design
Pollution free Eco System
Energy efficient green certified built space